A Full and true answer to the reasons against passing the bill for re-building Maismore Bridge, raising, widening, and securing Over's Causeway, and repairing, &c. the streets of Gloucester [electronic resource].
1777
Formats
Format | |
---|---|
BibTeX | |
MARCXML | |
TextMARC | |
MARC | |
DublinCore | |
EndNote | |
NLM | |
RefWorks | |
RIS |
Linked e-resources
Details
Title
A Full and true answer to the reasons against passing the bill for re-building Maismore Bridge, raising, widening, and securing Over's Causeway, and repairing, &c. the streets of Gloucester [electronic resource].
Created/published
[London] : [s.n.], [1777]
Description
5,[1]p. ; fol..
Note
This record was provided by a vendor. It may contain incorrect or incomplete information.
Drop-head title.
Date from docket title.
Apparently a reply to 'Reasons humbly submitted to the consideration of the Honorable House of Commons, .. why the bill, .. for building the bridge .. at Maismore .. should not pass into a law.'.
Reproduction of original from Bodleian Library (Oxford).
Drop-head title.
Date from docket title.
Apparently a reply to 'Reasons humbly submitted to the consideration of the Honorable House of Commons, .. why the bill, .. for building the bridge .. at Maismore .. should not pass into a law.'.
Reproduction of original from Bodleian Library (Oxford).
Reproduction
Electronic reproduction. Farmington Hills, Mich. : Cengage Gale, 2009.
Cited/described in
English Short Title Catalog (ESTC), T215545
Place of creation/publication
Great Britain -- England -- London.
Item Details
Call number
Available offsite via a Folger OpenAthens account